Metricup Farm Irrigation
Electrical Contracting

In April of 2026, we got the opportunity to provide a client in the South West with their very own Off grid irrigation dam pump for a large scale vineyard.

Key Elements:

  • 72V surface mounted solar pump capable of delivering 116LPM

  • 96V battery bank capable of running the pump over night

  • 72V DC/DC charger programmed with optimal solar to battery charge.

  • A 2.64kW Solar System on a custom stainless steel frame to provide enough battery charge even in the Winter months.

  • An individule Battery/Solar enclosure capable of running timers for vineyard stations

  • Custom return spring close actuated valves controlled by timers for set watering times.

​

Metricup
Irrigation valves - VERIZA
Solar Chargers - VERIZA
Irrigation - Veriza
Solar Arrays - VERIZA
Custom Panels - VERIZA

Water Treatment Switchboards

 

Since we started out in 2022, we brought a lot of expertise and experience to the switchboard building realm. 

Key projects won and complete: 

  • Karratha Health Campus (WWS)

  • Hedland Helath Campus (WWS)

  • Coca-Cola Amatil Kewdale UV enclosures (Phoenix Water)

  • Boab Vexa Camp Water Supply (Phoenix Water)

  • WES Dust Suppression System (Dynamic Resource Solutions/Duststop)

  • Off-Grid Dosing Cabinets (Duststop)

  • Fremantle Hospital RO upgrades (WWS)

  • Curtin University Tradewaste and Type 2 water plants (WWS)

​

Custom Panels - VERIZA
Enclosures - VERIZA
MCC - Veriza

Coca-Cola Amatil Kewdale -UV Upgrades

 

Engaged by Phoenix Water Services to create, build, install and commission a completely new set of UV panels for a large RO plant at Coca-Cola in Perth.

Key takeaways:

  • UV intensity monitoring - sensors to be fabricated and installed into current custom built UV vessels

  • Client feedback option - dry contacts

  • Compliance with current food and beverage limits in UV disinfection

  • Complete build and install before Christmas 2025 - 4 week turnaround from PO to delivery.

UV Dissinfection - VERIZA
UV - VERIZA
Panels
Enclosures Automation WATER

MACA Interquip - Safety Shower Skid

 

Engaged by Phoenix Water Services again, we went full mine spec. on a new project for MACA Interquip to design, build, factory install and FAT a custom panel and skid.

Key takeaways:

  • Mine specifications to be followed

  • PLC and HMI programming done based on clients process

  • Safety features and local climate regulations

  • Completed in 2 weeks from PO

Enclosures Automation WATER
Enclosures Automation WATER

Multiple Site Installations

 

VERIZA has greatfully been a part of a number of meaningful and important projects over the years. This original;ly started as electrical install only, until we dove into providing a completely electrically compliant process, from enclosure build and test, to field installation and commissioning.

​

Visit our photo gallery - link above and below.

​

​

Projects Completed By Veriza

VERIZA
Master electricians
Bronze member master electricians
Phoenix Tech Consulting
  • Instagram

Tel:       0448 601 637

Email:   luke.mellor@veriza.com.au

             alex.mellor@veriza.com.au

​

Eclipse Services

VERIZA Electrical + Water Solutions Pty Ltd

ABN: 76 650 288 869                                                                                                        VERIZA Electrical + Water Solutions Pty Ltd                                                                                                           EC: 14735

Our Partnerships and preferred suppliers below - click for links

bottom of page